Design levels from KSA 6997-KSA-03-XX-DR-C-0001 S4-G · to be updated to as-built at handover
CCG
IMPERIAL FIELDS – RESIDENTIAL BLOCK
Drainage chamber record · Bishopsford Road, Morden SM4 6BF
STORM / DITCH DIVERSION
SD.6
Polypropylene inspection chamber 600 dia
NON-ENTRY CHAMBERToo small to enter – all work from the surface (rods, jetting, CCTV camera).

Key data · levels: design (KSA S4-G)

Cover level20.575
Invert level19.840
Depth0.735 m
Chamber600 Ø
Pipe300 Ø
Cover classB125

Section through chamber

B125 coverID platebenching with channel at invertINOUT 300ØCL 20.575IL 19.8400.735 mIllustrative, not to scale · 600 Ø polypropylene inspection chamber · levels in m (drawing datum)

Where it is

Location of SD.6
Extract of KSA drainage layout – SD.6 circled red.

Inspection & maintenance

Carried out byAppointed third-party maintenance team
  1. Every 6 months and after storms: inspect from the surface; clear leaves, debris and silt.
  2. Check the ditch diversion pipe flows freely; jet if needed.
  3. Record every visit in the log below (date, name, findings, action) with photos.

CCTV survey

Report refTo be completed at handover
Survey date—
Video—

Handover record – where CCG finished

Practical CompletionTo be completed at handover
Defects period endsTo be completed at handover
Handover inspectionTo be completed at handover
Condition at handoverTo be completed at handover
Silt at handover—
As-built levels verifiedTo be completed at handover
ID plate fittedTo be completed at handover

Inspection log

DateBy (company / name)Silt / conditionAction takenNext due