Design levels from KSA 6997-KSA-03-XX-DR-C-0001 S4-G · to be updated to as-built at handover
STORM / DITCH DIVERSIONSD.2
Polypropylene inspection chamber 600 dia
NON-ENTRY CHAMBERToo small to enter – all work from the surface (rods, jetting, CCTV camera).
Key data · levels: design (KSA S4-G)
Cover level20.450
Invert level19.300
Depth1.150 m
Chamber600 Ø
Pipe300 Ø
Cover classB125
Section through chamber
Where it is

Extract of KSA drainage layout – SD.2 circled red.
Inspection & maintenance
Carried out byAppointed third-party maintenance team
- Every 6 months and after storms: inspect from the surface; clear leaves, debris and silt.
- Check the ditch diversion pipe flows freely; jet if needed.
- Record every visit in the log below (date, name, findings, action) with photos.
CCTV survey
Report refTo be completed at handover
Survey date—
Video—
Handover record – where CCG finished
Practical CompletionTo be completed at handover
Defects period endsTo be completed at handover
Handover inspectionTo be completed at handover
Condition at handoverTo be completed at handover
Silt at handover—
As-built levels verifiedTo be completed at handover
ID plate fittedTo be completed at handover
Inspection log
| Date | By (company / name) | Silt / condition | Action taken | Next due |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |