Design levels from KSA 6997-KSA-03-XX-DR-C-0001 S4-G · to be updated to as-built at handover
SURFACE WATERS3.11
Polypropylene inspection chamber 475 dia with catchpit (silt sump)
NON-ENTRY CHAMBERToo small to enter – all work from the surface (rods, jetting, CCTV camera).
Key data · levels: design (KSA S4-G)
Cover level20.450
Invert level19.650
Sump level19.350
Depth to sump1.100 m
Pipe150 Ø
Cover classB125
Section through chamber
Where it is

Extract of KSA drainage layout – S3.11 circled red.
Inspection & maintenance
Carried out byAppointed third-party maintenance team
- Every 6 months and after heavy storms: inspect from the surface; measure silt depth in the sump.
- Remove silt by vac tanker when the sump is about 1/3 full – before silt reaches the outlet.
- Check the outlet pipe is clear; jet if flow is slow.
- Record every visit in the log below (date, name, findings, action) with photos.
CCTV survey
Report refTo be completed at handover
Survey date—
Video—
Handover record – where CCG finished
Practical CompletionTo be completed at handover
Defects period endsTo be completed at handover
Handover inspectionTo be completed at handover
Condition at handoverTo be completed at handover
Silt at handover—
As-built levels verifiedTo be completed at handover
ID plate fittedTo be completed at handover
Inspection log
| Date | By (company / name) | Silt / condition | Action taken | Next due |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |